Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"
From GlueXWiki
(→Thursday, Oct 25 at 08:45) |
(→Friday, Oct 26 at 08:45) |
||
Line 1: | Line 1: | ||
== Friday, Oct 26 at 08:45 == | == Friday, Oct 26 at 08:45 == | ||
# Last 24h | # Last 24h | ||
+ | #* Shifts were on standby until 8pm | ||
+ | #* Hall went into beam permit ~8:30pm | ||
+ | #* Filled target, performed harp scans, checked radiation levels | ||
+ | #* Started taking data with AMO ~10:40pm | ||
# Issues and current Status | # Issues and current Status | ||
# Reports | # Reports |
Revision as of 23:02, 25 October 2018
Friday, Oct 26 at 08:45
- Last 24h
- Shifts were on standby until 8pm
- Hall went into beam permit ~8:30pm
- Filled target, performed harp scans, checked radiation levels
- Started taking data with AMO ~10:40pm
- Issues and current Status
- Reports
- Plans
- AoB
Thursday, Oct 25 at 08:45
- Last 24h
- Took data with 180nA beam until 9:00am
- Emptied target, coll. to block, gon. to blank
- FCAL Base replacements
- Issues and current Status
- Hall is in controlled access
- Accell.
- Extended phaser studies/tests into swing-shift
- Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
- Earliest to expect beam: Around owl-shift (i.e. Friday)
- Reports
- Plans
- Today
- Work in hall (stay in controlled access)
- BCAL (Elton)
- TOF (Beni)
- Walk through(s)
- Shifts are on standby until 11:59pm today
- IF beam is back:
- Fill target, perform harp scans, check radiation levels, PS-rates,...
- Start data taking with AMO @ 180nA
- Work in hall (stay in controlled access)
- Upcoming days
- Take data as soon as beam is available
- Accel.
- Beam studies on Monday
- RF recovery for Tuesday, need to re-tune one of the cavitis
- Today
- AoB