Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"
From GlueXWiki
(→Thursday, Oct 25 at 08:45) |
(→Thursday, Oct 25 at 08:45) |
||
Line 15: | Line 15: | ||
# Plans | # Plans | ||
#* Today | #* Today | ||
− | #** Work in hall | + | #** Work in hall (stay in controlled access) |
− | #** | + | #*** BCAL (Elton) |
+ | #*** TOF (Beni) | ||
+ | #*** Walk through(s) | ||
+ | #** Shifts are on standby until 11:59pm today | ||
+ | #** IF beam is back: | ||
+ | #*** Fill target, perform harp scans, check radiation levels, PS-rates,... | ||
+ | #*** Start data taking with AMO @ 180nA | ||
#* Upcoming days | #* Upcoming days | ||
#** Take data as soon as beam is available | #** Take data as soon as beam is available | ||
− | #** Accel. | + | #** Accel. |
+ | #*** Beam studies on Monday | ||
+ | #*** RF recovery for Tuesday, need to re-tune one of the cavitis | ||
# AoB | # AoB |
Revision as of 09:41, 25 October 2018
Thursday, Oct 25 at 08:45
- Last 24h
- Took data with 180nA beam until 9:00am
- Emptied target, coll. to block, gon. to blank
- FCAL Base replacements
- Issues and current Status
- Hall is in controlled access
- Accell.
- Extended phaser studies/tests into swing-shift
- Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
- Earliest to expect beam: Around owl-shift (i.e. Friday)
- Reports
- Plans
- Today
- Work in hall (stay in controlled access)
- BCAL (Elton)
- TOF (Beni)
- Walk through(s)
- Shifts are on standby until 11:59pm today
- IF beam is back:
- Fill target, perform harp scans, check radiation levels, PS-rates,...
- Start data taking with AMO @ 180nA
- Work in hall (stay in controlled access)
- Upcoming days
- Take data as soon as beam is available
- Accel.
- Beam studies on Monday
- RF recovery for Tuesday, need to re-tune one of the cavitis
- Today
- AoB