Difference between revisions of "October 22, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 21: | Line 21: | ||
# Optical box | # Optical box | ||
#* Fabrication status update (Ernie and Jason) | #* Fabrication status update (Ernie and Jason) | ||
− | #** | + | #** Box window flange modification at Lesker (Ernie/Tim) |
#** Dark box enclosure: fabrication and testing (Jason) | #** Dark box enclosure: fabrication and testing (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
Line 27: | Line 27: | ||
#** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_08_2018.pdf Mirror box laser alignment] (Bill) | #** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_08_2018.pdf Mirror box laser alignment] (Bill) | ||
#* Testing in EEL 226 | #* Testing in EEL 226 | ||
+ | #** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason] | ||
#** Cabling tests and plans for dark box tests | #** Cabling tests and plans for dark box tests | ||
# DAQ integration | # DAQ integration |
Revision as of 12:29, 22 October 2018
Meeting Information
GlueX DIRC Meeting
Monday October 22, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Updated schedule from JLab management, full energy running until 11/26
- CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving
- Optical box
- Fabrication status update (Ernie and Jason)
- Box window flange modification at Lesker (Ernie/Tim)
- Dark box enclosure: fabrication and testing (Jason)
- Quartz window (with modified flange) (Ernie)
- Testing in ESB
- Mirror box laser alignment (Bill)
- Testing in EEL 226
- Darkbox cabling from Jason
- Cabling tests and plans for dark box tests
- Fabrication status update (Ernie and Jason)
- DAQ integration
- Slow controls
- Software/simulations
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB