Difference between revisions of "Run Planning Meeting Notes, Oct 4-Oct 10, 2018"
From GlueXWiki
Line 10: | Line 10: | ||
#* RF recovery, detector maintenance, etc, etc [https://logbooks.jlab.org/entry/3606456][https://logbooks.jlab.org/entry/3606414][https://logbooks.jlab.org/entry/3606449] | #* RF recovery, detector maintenance, etc, etc [https://logbooks.jlab.org/entry/3606456][https://logbooks.jlab.org/entry/3606414][https://logbooks.jlab.org/entry/3606449] | ||
#CEBAF | #CEBAF | ||
+ | #*Troublesome and lengthy beam restoration on swing shift | ||
#Action Items | #Action Items | ||
#Issues | #Issues |
Revision as of 22:25, 9 October 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Contents
Wednesday, Oct 10 at 08:45
- Notes from the past 24 hours:
- CEBAF
- Troublesome and lengthy beam restoration on swing shift
- Action Items
- Issues
- Reports
- Run Plan
- Wednesday
- Thursday
- Fall run plan
- AOB
- Next RC, Colin
Tuesday, Oct 9 at 08:45
- Notes from the past 24 hours:
- Production running
- Trigger Spreadsheet
- Transmission drop last night
- Energy oscillations and server crash
- CEBAF
- Action Items
- Issues
- Reports
- Run Plan
- AOB
Monday, Oct 8 at 08:45
- Notes from the weekend:
- Successfully tested the beam blocker. It still blocks beam(!)
- Dipole trip
- CEBAF
- Action Items
- Issues
- TAC run. How useful was it? What remains to be visited on this?
- Reports
- Run Plan
- AOB
Sunday, Oct 7
- No meeting
Saturday, Oct 6
- No meeting
Friday, Oct 5 at 08:45
- Notes from the previous 24 hours:
- Achieved a full run cycle of polarisation settings overnight (Go team GWU!)
- Microscope threshold scan complete
- FCal LED trigger
- CEBAF:
- Hall C down for access (we do our TAC run during)
- Action Items:
- Currently filed under opportunistic access:
- target alarm thresholds
- More oil in the CDC bubbler
- Currently opportunistic, but possibly more urgent
- Currently filed under opportunistic access:
- Issues:
- Reports:
- Monitoring
- First look at rho polarisation
- Run Plan:
- Week 3 Week 4
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB
Thursday, Oct 4 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- PSS trip in North Linac
- Hall C will ramp up to 60uA end of day shift/start of swing
- Action Items:
- Definition of nominal coherent peak energy
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Discussion of rates
- Issues:
- Cigarette butts in the indoor trash - don't!
- Reports:
- Monitoring
- Run Plan:
- Week 2 Week 3 Week 4
- Thursday
- 0930 access
- TAC run preparation, Hovanes with ARM to install the Pb converter
- Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
- Radcon repair to radiation monitor to fix the alarm in counting room
- Hovanes will calibrate A.C. high gain setting (am, after access)
- 0930 access
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB