# Optical box | # Optical box | ||
#* Fabrication status update (Ernie and Jason) | #* Fabrication status update (Ernie and Jason) | ||
− | |||
#** Mirror boxes delivered to JLab! (Ernie) | #** Mirror boxes delivered to JLab! (Ernie) | ||
+ | #** Warping of window flange and plan to address at Lesker (Ernie/Tim) | ||
#** Dark box enclosure (Jason) | #** Dark box enclosure (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
#* Testing in ESB | #* Testing in ESB | ||
− | #** | + | #** Mirror box laser alignment (Bill) |
#* Installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf] | #* Installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf] | ||
# DAQ integration | # DAQ integration |
Revision as of 11:54, 5 October 2018
Meeting Information
GlueX DIRC Meeting
Monday October 8, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- JLab management still deciding how to make up lost time this Fall: preliminary plan from Hall D
- Optical box
- Fabrication status update (Ernie and Jason)
- Mirror boxes delivered to JLab! (Ernie)
- Warping of window flange and plan to address at Lesker (Ernie/Tim)
- Dark box enclosure (Jason)
- Quartz window (with modified flange) (Ernie)
- Testing in ESB
- Mirror box laser alignment (Bill)
- Installation schedule: [2]
- Fabrication status update (Ernie and Jason)
- DAQ integration
- Slow controls
- Software/simulations
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB