Difference between revisions of "September 24, 2018 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday September 24, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom roo...") |
(→Agenda) |
||
Line 27: | Line 27: | ||
#** Mirror box laser alignment (Bill) | #** Mirror box laser alignment (Bill) | ||
# DAQ integration | # DAQ integration | ||
− | #* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully | + | #* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully tested: [https://halldweb.jlab.org/wiki/images/7/70/DIRCParseEVIO.pdf parsed hit display] |
# Slow controls | # Slow controls | ||
#* Initial versions of voltage GUIs in place, scalers will follow. | #* Initial versions of voltage GUIs in place, scalers will follow. |
Revision as of 08:37, 24 September 2018
Meeting Information
GlueX DIRC Meeting
Monday September 24, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration meeting this week
- Optical box
- Fabrication status update (Ernie and Jason)
- Mirror box completion and delivery
- Dark box enclosure (Jason)
- Quartz window (with modified flange) (Ernie)
- Updated installation schedule: [2]
- Testing in ESB
- Mirror box laser alignment (Bill)
- Fabrication status update (Ernie and Jason)
- DAQ integration
- 2 modules with internal pulser readout (Logbook) and successfully tested: parsed hit display
- Slow controls
- Initial versions of voltage GUIs in place, scalers will follow.
- Software/simulations
- Software overview and tasks (All)
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- Individual bar dimensions implemented in HDDS
- XML parser written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc.
- Time-based studies (Maria)
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB