Line 22: | Line 22: | ||
#** Dark box enclosure (Jason) | #** Dark box enclosure (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
− | #* Updated installation schedule: | + | #* Updated installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf] |
#* Planning for ESB | #* Planning for ESB | ||
#** Mirror box laser alignment (Bill/Stephanie) | #** Mirror box laser alignment (Bill/Stephanie) |
Revision as of 12:22, 10 September 2018
Meeting Information
GlueX DIRC Meeting
Monday September 10, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box
- Fabrication status update (Ernie and Jason)
- Mirror cutting and installation: Delivery to JLab expected September 17 (Ernie)
- Dark box enclosure (Jason)
- Quartz window (with modified flange) (Ernie)
- Updated installation schedule: [2]
- Planning for ESB
- Mirror box laser alignment (Bill/Stephanie)
- Fabrication status update (Ernie and Jason)
- DAQ integration
- Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: Logbook
- David/Justin testing in EVIO parser offline
- Slow controls
- Vanik is at JLab and working on voltage GUIs (HV/LV). Scalers will follow.
- MAPMT testing
- Magnetic field test initial results (Bill and Andrew)
- Software/simulations
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB