Difference between revisions of "July 18, 2018 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Analysis Meeting<br> Thursday July 18, 2018<br> 10:00 am, EDT<br> JLab room F224<br> == Connection Using Bluejeans == # To join via Poly...") |
(→Agenda) |
||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
#* Documentation wiki page [[DIRC]] | #* Documentation wiki page [[DIRC]] | ||
− | # Simulation studies | + | # Simulation studies |
#* Writeup of LUT algorithm provided by Maria | #* Writeup of LUT algorithm provided by Maria | ||
+ | #* Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie, Maria) | ||
#* Implementation of reconstruction in PID library underway (Justin) | #* Implementation of reconstruction in PID library underway (Justin) | ||
− | # | + | #* Implementation of algorithms beyond LUT (Cris, Mike) |
+ | #* Required datasets and MC production (All) | ||
+ | # MAPMT testing (Bill and Andrew) | ||
# [[Fall 2018 DIRC Commissioning|Commissioning plans]] | # [[Fall 2018 DIRC Commissioning|Commissioning plans]] | ||
+ | # Alignment calibration strategy discussion (All) | ||
# Reminder: [[Addressing ERR review recommendations]] | # Reminder: [[Addressing ERR review recommendations]] | ||
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam) | #* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam) | ||
# AOB | # AOB |
Revision as of 12:24, 17 July 2018
Meeting Information
GlueX DIRC Analysis Meeting
Thursday July 18, 2018
10:00 am, EDT
JLab room F224
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Documentation wiki page DIRC
- Simulation studies
- Writeup of LUT algorithm provided by Maria
- Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie, Maria)
- Implementation of reconstruction in PID library underway (Justin)
- Implementation of algorithms beyond LUT (Cris, Mike)
- Required datasets and MC production (All)
- MAPMT testing (Bill and Andrew)
- Commissioning plans
- Alignment calibration strategy discussion (All)
- Reminder: Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)
- AOB