Difference between revisions of "June 14, 2018 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 19: | Line 19: | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23] | ||
− | # | + | # Bar box transportation and installation (Tim, Mark) |
+ | #* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt) | ||
+ | #* Lessons learned for upper bar box installation (Tim) | ||
# Optical box | # Optical box | ||
#*Status update (Ernie and Jason) | #*Status update (Ernie and Jason) | ||
Line 26: | Line 28: | ||
#** Window procurement | #** Window procurement | ||
#** Dark box conceptual design | #** Dark box conceptual design | ||
+ | #* Installation schedule | ||
# Simulation studies (Maria and Roman) | # Simulation studies (Maria and Roman) | ||
# MAPMT testing (Bill) | # MAPMT testing (Bill) | ||
# AOB | # AOB |
Revision as of 12:29, 13 June 2018
Meeting Information
GlueX DIRC Meeting
Thursday June 14, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Bar box transportation and installation (Tim, Mark)
- Notes from the road (Matt)
- Lessons learned for upper bar box installation (Tim)
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker
- PMT test fixture and cookies (Maria)
- Window procurement
- Dark box conceptual design
- Installation schedule
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB