Difference between revisions of "June 23, 2008 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 28: | Line 28: | ||
=Minutes= | =Minutes= | ||
− | Participants: | + | Participants: Zisis, Andrei, George, Elton, Elke, Beni, Tim, Matt. <br> |
+ | |||
+ | * Note: Here are some brief to-do-list based on the summary discussion. (Elton). | ||
+ | |||
+ | * Given the limited manpower and time, we decided to come up with a conceptual design based on wire-mesh pmts as an "alternative" backup for the Lehman Review. | ||
+ | |||
+ | * Homework | ||
+ | ** Review segmentation requirements, especially for inner calorimeter (Zisis report on work to date) | ||
+ | ** Clarify geometry in current files (Beni) | ||
+ | ** Assess impact of material in current geometry compared to geometry used for cal review. (Matt and Mihajlo). | ||
+ | ** Design team (Tim) will develop some layouts at the end of the calorimeter which could accommodate the wire-mesh pmt alternative. |
Revision as of 13:53, 9 June 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: May 27, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Agenda
- Updates
- Calibration system update
- FCAL
- BCAL
- Absolute light output of fibers
- Preparations for Lehman Review
- Alternative readout
- Detailed schedule and plans for Construction
- Review of Action-Item Tracker for Calorimetry
- Any other business
Minutes
Participants: Zisis, Andrei, George, Elton, Elke, Beni, Tim, Matt.
- Note: Here are some brief to-do-list based on the summary discussion. (Elton).
- Given the limited manpower and time, we decided to come up with a conceptual design based on wire-mesh pmts as an "alternative" backup for the Lehman Review.
- Homework
- Review segmentation requirements, especially for inner calorimeter (Zisis report on work to date)
- Clarify geometry in current files (Beni)
- Assess impact of material in current geometry compared to geometry used for cal review. (Matt and Mihajlo).
- Design team (Tim) will develop some layouts at the end of the calorimeter which could accommodate the wire-mesh pmt alternative.