Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Monday, May 7 at 08:45) |
(→Monday, May 7 at 08:45) |
||
Line 8: | Line 8: | ||
== Monday, May 7 at 08:45 == | == Monday, May 7 at 08:45 == | ||
# Notes from the previous 48 hours: | # Notes from the previous 48 hours: | ||
− | #* [https://logbooks.jlab.org/entry/3573788 | + | #* Fast raster during swing shift on Suturday (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site |
+ | #* Trigger tests (Sasha): 9pm - 3am, trigger efficiency with ST, test with TOF trigger [https://logbooks.jlab.org/entry/3573788] | ||
#* 5am end of physics, 6am end of run, restricted access from 10am | #* 5am end of physics, 6am end of run, restricted access from 10am | ||
#* Shutdown: [https://logbooks.jlab.org/entry/3573898][https://logbooks.jlab.org/entry/3573891][https://logbooks.jlab.org/entry/3573890][https://logbooks.jlab.org/entry/3573875] | #* Shutdown: [https://logbooks.jlab.org/entry/3573898][https://logbooks.jlab.org/entry/3573891][https://logbooks.jlab.org/entry/3573890][https://logbooks.jlab.org/entry/3573875] |
Revision as of 10:34, 6 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Monday, May 7 at 08:45
- Notes from the previous 48 hours:
- Fast raster during swing shift on Suturday (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site
- Trigger tests (Sasha): 9pm - 3am, trigger efficiency with ST, test with TOF trigger [1]
- 5am end of physics, 6am end of run, restricted access from 10am
- Shutdown: [2][3][4][5]
- Issues:
- Reports:
- AOB
Saturday, May 5 at 08:45 (no meeting)
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Issues:
- DAQ not starting, needed reboot of rocTRIG2
- MCC corrected beam position on AC
- RootSpy not starting, xMsg server reset [27]
- Reports:
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB