Line 10: | Line 10: | ||
#* RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00 | #* RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00 | ||
#* Hall A pass change (several h) | #* Hall A pass change (several h) | ||
− | #* Network problems on accelerator site: https://logbooks.jlab.org/entry/3571038 | + | #* Network problems on accelerator site: [https://logbooks.jlab.org/entry/3571038] |
#* Harp Scan | #* Harp Scan | ||
#* Production running | #* Production running |
Revision as of 21:33, 2 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, May 3 at 08:45
- Notes from the previous 24 hours:
- RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00
- Hall A pass change (several h)
- Network problems on accelerator site: [1]
- Harp Scan
- Production running
- Issues:
- Reports:
- Run Plan
- Thursday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Friday
- Production
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run
- Week 17
- Thursday
- AOB