Revision as of 08:41, 27 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Running with 750 um converter
- TPOL runtime estimate - R. Jones
- Running with 750 um converter
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- TAC Run (2 pm)
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Level 1 trigger studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [10]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB