Revision as of 07:12, 2 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- MCC reports
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan as proposed in Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
- Issues:
- Reports (some of these shown at the AWG yesterday):
- Planning:
- updated run time chart [9]
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
Thursday, March 2
- Notes from the previous 24 hours:
- Issues:
- DAQ crashes at go (Sasha fixed it) ~40 mins banu https://logbooks.jlab.org/entry/3540927
- downtime - issue with one of the cavities ~1.5h (2L15-4 dropping zone from HV; Cavity bypassed; still dropping zone. EES-RF contacted.)
- FDC trips during owl shift [17] [SF, VC]
- Reports
- Planning:
- updated run time chart [20]
- Today's run plan (TBD) Run Plan Google Calendar Accel. Run Plan Google Calendar:
- harp scan
- Sasha planning ~30 min run using the thicker 750 um thick converter after harp scan
- Production