Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"
From GlueXWiki
(→Thursday, March 1) |
|||
Line 11: | Line 11: | ||
#* At about 6pm, we started low intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 as proposed in Justin's google sheet] | #* At about 6pm, we started low intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 as proposed in Justin's google sheet] | ||
#* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset | #* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset | ||
+ | #* [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm) | ||
# Issues: | # Issues: | ||
#* (fixed) Sean updated the CDC timing for the low intensity scan, see [https://logbooks.jlab.org/entry/3540445]. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]). How to restore production running (by Elton) [https://logbooks.jlab.org/entry/3540466]. | #* (fixed) Sean updated the CDC timing for the low intensity scan, see [https://logbooks.jlab.org/entry/3540445]. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]). How to restore production running (by Elton) [https://logbooks.jlab.org/entry/3540466]. |
Revision as of 00:55, 1 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan as proposed in Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
- Issues:
- Reports (some of these shown at the AWG yesterday):
- Production vertex position before/after collimator shift (runs 40496 and 40509) [AA]
- Pedestals Monitor FCAL, BCAL (run 41546 - production) [3] [SF]
- Planning:
- updated run time chart [4]
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning (?)