Difference between revisions of "2017-01 recon ver02 plans"
From GlueXWiki
(→Checklist) |
(→Checklist) |
||
Line 2: | Line 2: | ||
=== Checklist === | === Checklist === | ||
− | * New TOF ADC/TDC hit matching | + | * New TOF ADC/TDC hit matching (Beni) - check monitoring results |
* FCAL | * FCAL | ||
− | ** Add shower classifier (Matt/Sean) | + | ** Add shower classifier (Matt/Sean) - maybe not at this point |
− | ** Geometry (Sean coordinates) | + | ** <strike>Geometry</strike> (Sean coordinates) - DONE |
** Update calibrations - three periods: high-rate 2017, low-rate 2017, 2016 | ** Update calibrations - three periods: high-rate 2017, low-rate 2017, 2016 | ||
*** Gains | *** Gains | ||
*** Shower non-linearities | *** Shower non-linearities | ||
− | *** Timing | + | *** Timing: constants, sim-recon |
− | * Update Start Counter Resolutions (Mahmoud/Sean) | + | * <strike>Update Start Counter Resolutions</strike> (Mahmoud/Sean) - DONE |
− | * Updates to track projection (Simon) | + | * <strike>Updates to track projection</strike> (Simon) - NOT DOING |
+ | * BCAL - charged track reconstruction issues? - Simon | ||
+ | * TAGM - Updates to timing - Alex B./Sean | ||
+ | |||
+ | FCAL --- Colin | ||
+ | BCAL --- Elton/Simon | ||
+ | TOF --- Beni | ||
+ | TAGM --- Alex B. | ||
+ | Track extrapolation --- Simon | ||
+ | Vertex Studies? --- Mike | ||
+ | Analysis checks --- Alex A.<strike> | ||
=== Plans === | === Plans === |
Revision as of 11:28, 2 November 2017
Checklist
- New TOF ADC/TDC hit matching (Beni) - check monitoring results
- FCAL
- Add shower classifier (Matt/Sean) - maybe not at this point
-
Geometry(Sean coordinates) - DONE - Update calibrations - three periods: high-rate 2017, low-rate 2017, 2016
- Gains
- Shower non-linearities
- Timing: constants, sim-recon
-
Update Start Counter Resolutions(Mahmoud/Sean) - DONE -
Updates to track projection(Simon) - NOT DOING - BCAL - charged track reconstruction issues? - Simon
- TAGM - Updates to timing - Alex B./Sean
FCAL --- Colin
BCAL --- Elton/Simon
TOF --- Beni
TAGM --- Alex B.
Track extrapolation --- Simon
Vertex Studies? --- Mike
Analysis checks --- Alex A.
Plans
These improvements are expected to go into the next round of reconstructed data:
- improved CDC dE/dx calculation
- use of ADC amplitude instead of integral - dE/dx vs theta
- updated truncation value
- improved TOF calibrations
- use of ADC amplitude instead of integral
- <strike> new SC attenuation length corrections
- BCAL charged track clusterizer
- FCAL updates
- Updated gains (fix problems with inner rings)
- Updated timing (fix high-rate running problem)
- Update geometry?
- updated charged/neutral error matrices?
Outstanding questions:
- What is the bump in BCAL & FCAL monitoring delta T distributions at +4 ns?
- What is the bump in SC monitoring delta T distributions at ~ -8 ns?
- What is the inefficiency in the TOF matching efficiency near the beam hole due to?
- What is going on with the BCAL positions measurements?