Difference between revisions of "2017-04-26"
From GlueXWiki
(→Detector Updates) |
(→Announcements) |
||
Line 15: | Line 15: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
− | * Publications | + | * Publications [http://dx.doi.org/10.1103/PhysRevC.95.042201 DOI:10.1103/PhysRevC.95.042201][https://arxiv.org/abs/1701.08123 arXiv:1701.08123] (2017). |
* [[GlueX-Collaboration-May-2017|Collaboration Meeting]] May 17-19, 2017 | * [[GlueX-Collaboration-May-2017|Collaboration Meeting]] May 17-19, 2017 | ||
* DIRC Update Review May 11 Morning | * DIRC Update Review May 11 Morning |
Revision as of 10:36, 26 April 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday April 26, 2017 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Publications DOI:10.1103/PhysRevC.95.042201arXiv:1701.08123 (2017).
- Collaboration Meeting May 17-19, 2017
- DIRC Update Review May 11 Morning
- L3/High-rate Update Review May 12 Afternoon
The Fall 2017 Runs
Analysis Activities
- Offline Software (April 12 Report)
- Production and Analysis Working Group April 19, 2017
- Physics Working Group April 17, 2017
Data Acquisition and Electronics Systems
- Online Systems January 11, 2017
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger Apr 20, 2017
- Electronics and Trigger
- Electronics Update
- FADC FPGA
- Level-1 Trigger
- High-intensity Running
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status April 24, 2017
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter April 20, 2017
- Tracking April 6, 2017
- CDC
- FDC
- Calorimeters: April 20, 2017
- BCAL
- FCAL
- TOF April 18, 2017
- DIRC System April 11, 2017 DIRC
Other Activities
- AOT