Difference between revisions of "Run Planning Meeting Notes, Mar 9 - Mar 15, 2017"
From GlueXWiki
(→Thursday, March 9) |
|||
Line 50: | Line 50: | ||
{|border | {|border | ||
|- | |- | ||
− | + | |width="50" align="center"| Shift | |
+ | |width="50" align="center"| ABU | ||
+ | |width="50" align="center"| BNA | ||
+ | |width="50" align="center"| BANU | ||
|- | |- | ||
− | |Day || 0: | + | |Day ||align="center"| 0:23 ||align="center"| 6:55||align="center"| 0:41 |
|- | |- | ||
− | |Swing || | + | |Swing ||align="center"| 4:05 ||align="center"| 3:27 ||align="center"| 0:27 |
|- | |- | ||
− | |Owl || | + | |Owl ||align="center"| 5:26 ||align="center"| 2:32 ||align="center"| 0:02 |
|- | |- | ||
− | |Total || | + | |Total ||align="center"| 9:54 ||align="center"| 12:55 ||align="center"| 1:10 |
|- | |- | ||
|} | |} |
Revision as of 08:12, 10 March 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 9
Shift | ABU | BNA | BANU |
Day | 0:40 | 7:18 | 0:02 |
Swing | 0:0 | 8:0 | 0.0 |
Owl | 0:24 | 6:55 | 0:41 |
Total | 1:04 | 22:13 | 0:43 |
- Accelerator Status over the last 24 hrs
- Accelerator busy with Hall C until 05:00
- Hall D first given beam at 05:20
- Data collection at 50nA started at 08:00
- Hall-D/GlueX items
- In the last 24 hours:
- Low-intensity production started at 08:00
- Long mode run (10 minutes) done at
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- DAQ issues:
- Monitoring
- low-level report
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB
Friday, March 10
Shift | ABU | BNA | BANU |
Day | 0:23 | 6:55 | 0:41 |
Swing | 4:05 | 3:27 | 0:27 |
Owl | 5:26 | 2:32 | 0:02 |
Total | 9:54 | 12:55 | 1:10 |
- Accelerator Status over the last 24 hrs
- Accelerator busy with Hall C until 05:00
- Hall D first given beam at 05:20
- Data collection at 50nA started at 08:00
- Hall-D/GlueX items
- In the last 24 hours:
- Low-intensity production started at 08:00
- Long mode run (10 minutes) done at
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- DAQ issues:
- Monitoring
- low-level report
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB