Difference between revisions of "Run Planning Meeting Notes, Feb 9-Feb 15, 2017"
From GlueXWiki
(→Monday, February 13) |
(→Monday, February 13) |
||
Line 11: | Line 11: | ||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* Running last 48 hours | #* Running last 48 hours | ||
− | #** ABUs hours | + | #** ABUs hours (371+339+279+380+ |
#** Triggers | #** Triggers | ||
− | #* CO2 bottle changeover didn't happen [https://logbooks.jlab.org/entry/3457679] [https://logbooks.jlab.org/entry/3457735] | + | #* Auto CO2 bottle changeover didn't happen [https://logbooks.jlab.org/entry/3457679] [https://logbooks.jlab.org/entry/3457735] |
#* Nitrogen valve stick [https://logbooks.jlab.org/entry/3457714] [https://logbooks.jlab.org/entry/3457740] | #* Nitrogen valve stick [https://logbooks.jlab.org/entry/3457714] [https://logbooks.jlab.org/entry/3457740] | ||
#* Rates vary with diamond orientations [https://logbooks.jlab.org/entry/3457757] [https://logbooks.jlab.org/entry/3457790] | #* Rates vary with diamond orientations [https://logbooks.jlab.org/entry/3457757] [https://logbooks.jlab.org/entry/3457790] | ||
#* Solenoid power supply transistor light persists [https://logbooks.jlab.org/entry/3457513] [https://logbooks.jlab.org/entry/3457753] | #* Solenoid power supply transistor light persists [https://logbooks.jlab.org/entry/3457513] [https://logbooks.jlab.org/entry/3457753] | ||
+ | #* DAQ disconnection [https://logbooks.jlab.org/entry/3457802] | ||
# Monitoring | # Monitoring | ||
#* Low level | #* Low level | ||
Line 26: | Line 27: | ||
#* Empty target run. Monday | #* Empty target run. Monday | ||
#* Trigger efficiency studies (4 hours) Wednesday | #* Trigger efficiency studies (4 hours) Wednesday | ||
+ | #* Full waveform run? | ||
# Offline Analysis? | # Offline Analysis? | ||
# Any Other Business? | # Any Other Business? |
Revision as of 22:00, 12 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Monday, February 13
- Accelerator Status
- 2 hour down overnight for RF problem, cavity "lost" its parameters somehow.
- Hall-D/GlueX items
- Monitoring
- Low level
- Beam properties histogram normalization problem? [10]
- High level
- Low level
- Run Plan
- Production
- Harp scan every 2 days. Monday
- Empty target run. Monday
- Trigger efficiency studies (4 hours) Wednesday
- Full waveform run?
- Offline Analysis?
- Any Other Business?
Saturday, February 11
- Accelerator Status
- 2 hour down overnight for RF problem, cavity "lost" its parameters somehow.
- Hall-D/GlueX items
- Running last 24 hours
- ABUs 15.4 hours
- Triggers
- Solenoid power supply transistor
- Harps scans show divergence in Y https://logbooks.jlab.org/entry/3457448
- Ask MCC to run Todd's script? Decide to leave it for now.
- Running last 24 hours
- Monitoring
- Low level
- Beam properties histogram: the issue was a change in the analysis cuts which applied to the new diamond but needed a new AMO reference
- Daily
- High level
- New features are nice
- Fits will be improved
- Beta plots need looking into.
- Low level
- Run Plan
- Production
- Harp scan every 2 days. Sunday
- Empty target run. Monday
- Trigger efficiency studies (4 hours) Wednesday
- Offline Analysis?
- Any Other Business?
Friday, February 10
- Accelerator Status
- Difficulties on Day Shift and into Swing. Owl smooth
- Hall-D/GlueX items
- Running last 24 hours
- ABUs 9 hours
- Triggers
- Coherent Peak Position
- Harp scans
- https://logbooks.jlab.org/entry/3457200
- If the beam returns from a down or if it's beam 2 days since the last scan.
- Running last 24 hours
- Monitoring
- Low level
- New channel out in FCAL; occupancy drift in single PS channel; LED signals still in some histograms, cuts coming; new statistics on some histograms (nice)
- High level
- Rho analysis, 30 kHz data before beam focus was tuned
- https://logbooks.jlab.org/entry/3456928
- timing calibration seems out; polarizations might not be good because of lack of accidental subtraction; signal to background looks great; 30% lower rho/trigger compared to Spring 2016(should improve with calibration); omega width 50% larger and yield lower by half
- Rho analysis, 30 kHz data before beam focus was tuned
- Low level
- Calibration
- Calibration jobs are on the farm right now, hopefully ready by Sunday/Monday.
- Run Plan
- Production
- Offline Analysis?
- Any Other Business?
Thursday, February 9
- Accelerator Status
- Slew of difficulties over Owl shift, pathlength drift, electronics problems, BPM problems
- Hall-D/GlueX items
- Running last day
- ABUs
- Triggers
- Coherent Peak Position difference
- 50 kHz running
- Smooth running, hodoscope up to 5.7 GeV turned off. Occasional glitches in the DAQ rate due to Java garbage collection (adding a few percent to deadtime.) 900 MB/s
- What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds)
- Monitoring
- Low level monitoring coordinator (Thomas): Report every morning.
- High level monitoring coordinator (Alex): Report every morning.
- Cut on triggers for monitoring
- Run DAQ when beam is gone
- Threshold for alerting experts?
- Run coordinator should be called for problems that limit data taking
- Target IOC problem overnight
- Reboot should be done by shift crew if they know how, otherwise call Deur, then cal Ito.
- End run script and RCDB entries
- Running last day
- Run Plan
- Align coherent peaks?
- Production
- Offline Analysis?
- Any Other Business?