Difference between revisions of "Run Planning Meeting Notes, Feb 9-Feb 15, 2017"
From GlueXWiki
Line 19: | Line 19: | ||
#** What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds) | #** What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds) | ||
#* Monitoring | #* Monitoring | ||
− | #** | + | #** Low level monitoring coordinator (Thomas): Report every morning. |
+ | #** High level monitoring coordinator (Alex): Report every morning. | ||
#** Cut on trigger 1 | #** Cut on trigger 1 | ||
#** data monitoring shifts | #** data monitoring shifts | ||
#** data anomalies | #** data anomalies | ||
+ | #** Run DAQ when beam is gone | ||
+ | #** Threshold for alerting experts? | ||
+ | #*** Run coordinator should be called for problems that limit data taking | ||
#* Target IOC problem overnight | #* Target IOC problem overnight | ||
− | #** | + | #** Reboot should be done by shift crew if they know how, otherwise call Deur, then cal Ito. |
#* End run script and RCDB entries | #* End run script and RCDB entries | ||
# Run Plan | # Run Plan |
Revision as of 10:39, 9 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 9
- Accelerator Status
- Slew of difficulties over Owl shift, pathlength drift, electronics problems, BPM problems
- Hall-D/GlueX items
- Running last day
- ABUs
- Triggers
- Coherent Peak Position difference
- 50 kHz running
- Smooth running, hodoscope up to 5.7 GeV turned off. Occasional glitches in the DAQ rate due to Java garbage collection (adding a few percent to deadtime.) 900 MB/s
- What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds)
- Monitoring
- Low level monitoring coordinator (Thomas): Report every morning.
- High level monitoring coordinator (Alex): Report every morning.
- Cut on trigger 1
- data monitoring shifts
- data anomalies
- Run DAQ when beam is gone
- Threshold for alerting experts?
- Run coordinator should be called for problems that limit data taking
- Target IOC problem overnight
- Reboot should be done by shift crew if they know how, otherwise call Deur, then cal Ito.
- End run script and RCDB entries
- Running last day
- Run Plan
- Align coherent peaks?
- Production
- Offline Analysis?
- Any Other Business?