Difference between revisions of "Controls Meeting 10-Nov-2016"
From GlueXWiki
Line 3: | Line 3: | ||
* CDC and ST temperature sensors (Nick) | * CDC and ST temperature sensors (Nick) | ||
* Goniometer status (Hovanes, Tim) | * Goniometer status (Hovanes, Tim) | ||
− | * Stonehenge scans | + | * <i>Stonehenge</i> scans this fall (Ken) |
* CAEN SY4527 HV chassis for DIRC/COMPCAL (Hovanes) | * CAEN SY4527 HV chassis for DIRC/COMPCAL (Hovanes) | ||
* Controls gluonxx computer problems (Hovanes) | * Controls gluonxx computer problems (Hovanes) |
Latest revision as of 11:55, 9 November 2016
- Announcements
- Solenoid status (Beni)
- CDC and ST temperature sensors (Nick)
- Goniometer status (Hovanes, Tim)
- Stonehenge scans this fall (Ken)
- CAEN SY4527 HV chassis for DIRC/COMPCAL (Hovanes)
- Controls gluonxx computer problems (Hovanes)
- Other topics
Time/Location
10:00AM Thursday 10-Nov-2016 CC B101