#** ABUs 7.8 hours in 3 shifts | #** ABUs 7.8 hours in 3 shifts | ||
#** Triggers (PARA 150M trigs, PERP 150 M trigs, unpolarizad 120 M trigs) | #** Triggers (PARA 150M trigs, PERP 150 M trigs, unpolarizad 120 M trigs) | ||
− | #** TRD studies | + | #** [https://logbooks.jlab.org/entry/3401353 TRD studies] |
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | #** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | ||
#* Hall D access Wednesday 20 April. | #* Hall D access Wednesday 20 April. | ||
− | #** | + | #** [https://logbooks.jlab.org/entry/3401112 Limit switches jumpered on the collimator stage] |
− | #** TRD | + | #** [https://logbooks.jlab.org/entry/3401118 BPU Al converter removed] |
− | #** | + | #** [https://logbooks.jlab.org/entry/3401093 TRD shielding plate removed.] |
+ | #** [https://logbooks.jlab.org/entry/3401120 active collimator has been moved to the 5mm hole] | ||
+ | #** [https://logbooks.jlab.org/entry/3401063 Preparations for 1350 Amp run of Solenoid completed] | ||
#** FCAL bases exchange | #** FCAL bases exchange | ||
#* Microscope gain balancing (has this been implemented??) | #* Microscope gain balancing (has this been implemented??) | ||
− | #* Report on TRD studies | + | #* Report on TRD studies [https://logbooks.jlab.org/entry/3401353 TRD runs] |
# Run Plan | # Run Plan | ||
#* PS harp scan with 5mm hole during magnet ramp | #* PS harp scan with 5mm hole during magnet ramp | ||
Line 30: | Line 32: | ||
# Offline Analysis? | # Offline Analysis? | ||
# Any Other Business? | # Any Other Business? | ||
− | |||
==Wednesday, April 20== | ==Wednesday, April 20== |
Revision as of 08:34, 21 April 2016
Thursday, April 21
- Accelerator Status
- Running smoothly, harps scan a little bit larger
- Hall-D/GlueX items
- Running overnight
- ABUs 7.8 hours in 3 shifts
- Triggers (PARA 150M trigs, PERP 150 M trigs, unpolarizad 120 M trigs)
- TRD studies
- Run Statistics
- Hall D access Wednesday 20 April.
- Microscope gain balancing (has this been implemented??)
- Report on TRD studies TRD runs
- Running overnight
- Run Plan
- PS harp scan with 5mm hole during magnet ramp
- Trigger studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- Production 50 um
- Mode 8 (raw mode) running
- Offline Analysis?
- Any Other Business?
Wednesday, April 20
- Accelerator Status
- Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Hall-D/GlueX items
- Running overnight
- ABUs 14.8 hours in 3 shifts (day 371 mins, Swing 320 mins, owl 200 mins)
- Triggers (PARA 354M trigs, PERP 375 M trigs)
- High luminosity tests (30 minutes), trigger studies (4 hours)
- Run Statistics
- Hall D access Wednesday 20 April.
- RadCon has been contacted.
- Access possible in the morning
- Beam studies in the afternoon (upstream slow locks)
- Walkthrough (Hall and Tagger)
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Microscope gain balancing
- Report on Trigger studies
- Report on TRD studies
- Latest Occupancy Plots look reasonable??
- "20 micron" diamond radiator thicknesses
- Running overnight
- Run Plan
- Mode 8 (raw mode) running with cosmics during access
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- PS harp scan with 5mm hole
- Offline Analysis?
- Any Other Business?
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
- No tagger access required???
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Latest Occupancy Plots look reasonable
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?