# Accelerator Status | # Accelerator Status | ||
#* Running overnight | #* Running overnight | ||
− | #** ABUs (309 + 328 + | + | #** ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes) |
#** Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M) | #** Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M) | ||
− | #* Scheduled accelerator down on Wednesday 20 April | + | #* Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm) |
#** RF recovery, beam studies, Hall A pass change | #** RF recovery, beam studies, Hall A pass change | ||
# Hall-D/GlueX items | # Hall-D/GlueX items |
Revision as of 08:30, 19 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
- RadCon has been contacted. Collimator cave access from 10 am or earlier.
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Latest Occupancy Plots
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?