Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"
From GlueXWiki
Line 21: | Line 21: | ||
#** Magnet work | #** Magnet work | ||
#** FCAL bases exchange | #** FCAL bases exchange | ||
− | #* Empty Target run with 5 mm hole | + | #* Empty Target run with 5 mm hole (Thursday ?) |
− | #* TAGM alignment | + | #* TAGM alignment (Thursday ?) |
#* [https://logbooks.jlab.org/entry/3400181 Latest Occupancy Plots] | #* [https://logbooks.jlab.org/entry/3400181 Latest Occupancy Plots] | ||
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] |
Revision as of 07:28, 19 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs (309 + 328 + ??)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April.
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
- RadCon has been contacted. Collimator cave access from 10 am or earlier.
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Latest Occupancy Plots
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?