Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"
From GlueXWiki
(→Wednesday, April 13) |
|||
Line 1: | Line 1: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule] | ||
* [http://calendar.google.com Google Calendar] | * [http://calendar.google.com Google Calendar] | ||
+ | |||
+ | ==Thursday, April 14== | ||
+ | |||
+ | # Accelerator Status | ||
+ | #* Beam went down at 8am Tuesday for beam studies. Expected back at noon. | ||
+ | #* ion | ||
+ | #* Hall-A getting 5-pass beam | ||
+ | #* Beam studies starting ~8am Thursday | ||
+ | #* Hall-B becomes priority 15:00 Friday | ||
+ | # Hall-D/GlueX items | ||
+ | #* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident] | ||
+ | #** CDC Repairs, Area survey for magnetic materials | ||
+ | #** Solenoid ramped to 1200A without incident | ||
+ | #* [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring] | ||
+ | #* [https://logbooks.jlab.org/entry/3398268 Occupancy Plots] | ||
+ | #* Latest scans: [https://logbooks.jlab.org/entry/3398296 5C11,5C11B] , [https://logbooks.jlab.org/entry/3398305 Hall-D harp scan] | ||
+ | #* [https://logbooks.jlab.org/entry/3398437 Current fluctuations] | ||
+ | #* other systems? | ||
+ | # Run Plan | ||
+ | #* TRD runs '''~1hr''' (Lubomir, Sergey) | ||
+ | #* TAC Run | ||
+ | #* <font size="+4">Trigger Studies</font> | ||
+ | #* Tagger alignment '''~1hr''' (Alex B.) | ||
+ | #* Mode 8 run w/ Amorphous '''~1hr''' | ||
+ | #* Halo Linearity scan (Hovanes) | ||
+ | #* Harp scan collection | ||
+ | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running on 50um diamond] | ||
+ | #** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test] ([https://logbooks.jlab.org/entry/3397865 partial progress1][https://logbooks.jlab.org/entry/3398324 partial progress2]) | ||
+ | #** Parasitic DAQ livetime/RAID test | ||
+ | # Offline analysis? | ||
+ | # AOB? | ||
==Wednesday, April 13== | ==Wednesday, April 13== |
Revision as of 07:45, 14 April 2016
Thursday, April 14
- Accelerator Status
- Beam went down at 8am Tuesday for beam studies. Expected back at noon.
- ion
- Hall-A getting 5-pass beam
- Beam studies starting ~8am Thursday
- Hall-B becomes priority 15:00 Friday
- Hall-D/GlueX items
- Solenoid Incident
- CDC Repairs, Area survey for magnetic materials
- Solenoid ramped to 1200A without incident
- Online Monitoring
- Occupancy Plots
- Latest scans: 5C11,5C11B , Hall-D harp scan
- Current fluctuations
- other systems?
- Solenoid Incident
- Run Plan
- TRD runs ~1hr (Lubomir, Sergey)
- TAC Run
- Trigger Studies
- Tagger alignment ~1hr (Alex B.)
- Mode 8 run w/ Amorphous ~1hr
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running on 50um diamond
- Parasitic quadrupole test (partial progress1partial progress2)
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?
Wednesday, April 13
- Accelerator Status
- Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until~2am.
- Ion chambers not reporting since 3/27
- Hall-A getting 5-pass beam
- Beam studies starting ~8am Thursday
- Hall-B becomes priority 15:00 Friday
- Hall-D/GlueX items
- Solenoid Incident
- CDC Repairs, Area survey for magnetic materials
- Solenoid ramped to 1200A without incident
- Online Monitoring
- Occupancy Plots
- Latest scans: 5C11,5C11B , Hall-D harp scan
- Current fluctuations
- other systems?
- Solenoid Incident
- Run Plan
- TRD runs ~1hr (Lubomir, Sergey)
- TAC Run
- Trigger Studies
- Tagger alignment ~1hr (Alex B.)
- Mode 8 run w/ Amorphous ~1hr
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running on 50um diamond
- Parasitic quadrupole test (partial progress1partial progress2)
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?
https://logbooks.jlab.org/entry/3398268
Tuesday, April 12
- Accelerator Status
- Beam went down at 7am for work in SL.
- Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
- Beam expected back late during swing shift or early owl
- Hall-D/GlueX items
- Solenoid Incident
- Initial indications
- Assessment and Repair plan
- Safety walkthrough
- Online Monitoring
- https://logbooks.jlab.org/entry/3397771 Pulser Trigger]
- Latest scans: 5C11,5C11B , Hall-D harp scan
- other systems?
- Solenoid Incident
- Run Plan
- Mode 8 run w/ Amorphous ~1hr
- TRD runs ~1hr (Lubomir, Sergey)
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running on 50um diamond
- Parasitic quadrupole test (partial progress)
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?
Monday, April 11
- Accelerator Status
- Beam went down at 7am for radcon survey of SL
- Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
- "... blind ..."
- Hall-D/GlueX items
- Solenoid Trip
- Latest scans: 5C11,5C11B , Hall-D harp scan
- Beam current Stability
- Rates and Live times
- other systems?
- Run Plan
- Mode 8 run w/ Amorphous ~1hr
- TRD runs ~1hr (Lubomir, Sergey)
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running
- Parasitic quadrupole test
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?