Difference between revisions of "March 25, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
|||
Line 19: | Line 19: | ||
# Announcements | # Announcements | ||
# Optical box design update (MIT) | # Optical box design update (MIT) | ||
+ | #* Mirror reflectivity measurements (John) | ||
+ | #* [https://gluexdirc.mit.edu/2-fibersbox-sigma-10-inclination-5 Calibration light source configuration] (Maria/Avetik) | ||
+ | #* [https://gluexdirc.mit.edu/materials-optical-properties MAPMT coupling material properties] (Maria) | ||
# Bar box shipping (John and Matt) | # Bar box shipping (John and Matt) | ||
#* [[Media:Dirc_shipping_3_25.pdf | Slides for discussion]] | #* [[Media:Dirc_shipping_3_25.pdf | Slides for discussion]] |
Revision as of 13:15, 23 March 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, March 25, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box design update (MIT)
- Mirror reflectivity measurements (John)
- Calibration light source configuration (Maria/Avetik)
- MAPMT coupling material properties (Maria)
- Bar box shipping (John and Matt)
- Support structure design update (IU)
- Dedicated meeting with Tim this afternoon at 1:30
- Planning for FY16
- AOB