Difference between revisions of "Possible Meeting Topics"
From GlueXWiki
m |
m |
||
Line 2: | Line 2: | ||
* Intro to SNMP - Vardan | * Intro to SNMP - Vardan | ||
− | |||
* Alarm systems - Elliott | * Alarm systems - Elliott | ||
* New simulation and study of energy sum trigger - Dave D, new group from China, Alex S, Eugene C | * New simulation and study of energy sum trigger - Dave D, new group from China, Alex S, Eugene C | ||
Line 8: | Line 7: | ||
* Status of timing and trigger distribution hardware development - Chris C. | * Status of timing and trigger distribution hardware development - Chris C. | ||
* Role of other JLab groups: computer center, scientific computing group, accelerator, etc. - by Andy, Chip, etc. | * Role of other JLab groups: computer center, scientific computing group, accelerator, etc. - by Andy, Chip, etc. | ||
− | * Brainstorming on control | + | * Brainstorming on control systems, alarms, operator environment - EJW |
− | + | ||
− | + | ||
* BOOST and new C++ standard - EJW | * BOOST and new C++ standard - EJW | ||
+ | * MonAlisa for SCADA layer - EJW | ||
* Report from Hall B - Serguei Boiarinov | * Report from Hall B - Serguei Boiarinov | ||
* Progress on front-end drivers - Dave Abbott | * Progress on front-end drivers - Dave Abbott | ||
− | * Coda | + | * Coda object framework and run control - EJW and Vardan |
* cMsg communications system - Carl Timmer and EJW | * cMsg communications system - Carl Timmer and EJW | ||
* ET distribution system - Carl Timmer | * ET distribution system - Carl Timmer | ||
* JANA/DANA for online monitoring and level 3 farm - David L. | * JANA/DANA for online monitoring and level 3 farm - David L. | ||
− | * Level 3 farm architecture - Graham | + | * ROC status - Dave A. |
+ | * EMU status - Graham H. | ||
+ | * Level 3 farm architecture - Graham H. | ||
* Full trigger design - Chinese group | * Full trigger design - Chinese group | ||
* Relationship between online and offline code development efforts - David L and EJW | * Relationship between online and offline code development efforts - David L and EJW |
Revision as of 10:39, 13 March 2008
(Note...if you suggest a topic put your name in parenthesis at the end so I can contact you...EJW)
- Intro to SNMP - Vardan
- Alarm systems - Elliott
- New simulation and study of energy sum trigger - Dave D, new group from China, Alex S, Eugene C
- Status of event size study - Elliott W, David L, Fernando B, Alex S, Eugene C
- Status of timing and trigger distribution hardware development - Chris C.
- Role of other JLab groups: computer center, scientific computing group, accelerator, etc. - by Andy, Chip, etc.
- Brainstorming on control systems, alarms, operator environment - EJW
- BOOST and new C++ standard - EJW
- MonAlisa for SCADA layer - EJW
- Report from Hall B - Serguei Boiarinov
- Progress on front-end drivers - Dave Abbott
- Coda object framework and run control - EJW and Vardan
- cMsg communications system - Carl Timmer and EJW
- ET distribution system - Carl Timmer
- JANA/DANA for online monitoring and level 3 farm - David L.
- ROC status - Dave A.
- EMU status - Graham H.
- Level 3 farm architecture - Graham H.
- Full trigger design - Chinese group
- Relationship between online and offline code development efforts - David L and EJW
- Online code management: Make vs Scons - ???
- Online logbook requirements and review of existing packages - do we need to write our own? - ???
- Bug tracking system: integrated into elog, Mantis, something else? - ???
- New TI card, timing and trigger distribution, etc. - Ed J.
- Front-end trigger bits - how many are possible, and what will we use them for - Ed J.