Line 47: | Line 47: | ||
== Run Readiness == | == Run Readiness == | ||
− | - | + | - Beni: the CDC is stable, but he hasn't check yet the occupancies in all the channels and if some cables are swapped (as it happened before). |
+ | |||
+ | - Luke checked the occupancies in all the FDC channels and showed a spreadsheet (linked above) with the results. Wires: in total three | ||
+ | channels with no or low signals: all are first channels of the pre-amp cards (in the first package) indicating maybe connection problem. | ||
+ | The four wire cards that were noisy before are now OK, but there's a new one with noise. Strips: total number of bad channels about the same - four channels that had problems before are OK, but five new problems all in one cathode in the fourth package. | ||
+ | |||
+ | - Lubomir attempted to fix a HV channel in the most downstream cell 6 of the fourth package. A 10cm Q-tip was needed to reach and clean the HV wire soldering place. First plot above shows |
Revision as of 19:53, 28 January 2016
January 28, 2016 Drift Chamber meeting
Connection
- Instructions for Bluejeans meeting connection
- Meeting ID: 290664653
- To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.
Agenda
- Collaboration meeting Feb 2016
- NIM Papers
- Run Readiness Run Coordination Meetings: Spring 2016 Run
- Electronics (Fernando, Chris, Nick)
- Other
Naomi chaired a separate meeting (with the same people) on the fADC125 firmware: FA125_firmware_check
Minutes
Participants: Curtis, Naomi (CMU) Eugene, Cody, Luke, Chris, Simon, Beni, and Lubomir (JLab).
Collaboration meeting
- Mike will report on the CDC status.
- Lubomir will give Simon 4-5 slides with the FDC update mostly related to the cathode hit reconstruction, as a part of Simon's track reconstruction talk. There will be no separate FDC talk.
- Segey will report on the TRD results from the last run.
- Naomi will have a talk on the fADC125 in another session but it might be moved to the tracking session (Curtis).
NIM papers
- Mike set up a new ShareLaTex tool for collaborative editing that will be used for the CDC paper (see link above).
- Lubomir is working on a contribution to the VCI conference (middle of February). The contribution will be published as a NIM paper but limited to 4 pages only; the deadline in middle of March. This contribution will be a separate paper from the general FDC paper, and will concentrate on the special studies mostly with the spare package.
Run Readiness
- Beni: the CDC is stable, but he hasn't check yet the occupancies in all the channels and if some cables are swapped (as it happened before).
- Luke checked the occupancies in all the FDC channels and showed a spreadsheet (linked above) with the results. Wires: in total three channels with no or low signals: all are first channels of the pre-amp cards (in the first package) indicating maybe connection problem. The four wire cards that were noisy before are now OK, but there's a new one with noise. Strips: total number of bad channels about the same - four channels that had problems before are OK, but five new problems all in one cathode in the fourth package.
- Lubomir attempted to fix a HV channel in the most downstream cell 6 of the fourth package. A 10cm Q-tip was needed to reach and clean the HV wire soldering place. First plot above shows