Difference between revisions of "Feb. 22, 2008 Tracking CDC/FDC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 13: | Line 13: | ||
### [http://www.jlab.org/Hall-D/software/wiki/images/c/cb/Pwa1-plots.pdf rebirth of pwa simulations] | ### [http://www.jlab.org/Hall-D/software/wiki/images/c/cb/Pwa1-plots.pdf rebirth of pwa simulations] | ||
# [[DC and PID Review]] Schedule for preparations (Elton) | # [[DC and PID Review]] Schedule for preparations (Elton) | ||
− | # CDC Hardware Status | + | # CDC Hardware Status [[ 22 February 2008 ]] |
# FDC Hardware Status | # FDC Hardware Status | ||
Revision as of 11:38, 22 February 2008
Agenda
- Status of MC resolution studies (David)
- EM Background rates (David)
- Status of Kinematic Fitting (Matt)
- Signal Leakage in pi/K (new studies) pi/K Separation (GlueX doc-971)
- Previous talk pi/K Separation (GlueX doc-971)
- Status of PWA anchoring (Paul, Alexander?)
- BNL-E852 tracking resolutions
- Three pi resonance generation & simulation
- DC and PID Review Schedule for preparations (Elton)
- CDC Hardware Status 22 February 2008
- FDC Hardware Status
Participating
Location
The meeting will be at 11:00am in Cebaf Center F324-325.
Telephone
To connect by telephone: 1.) dial:
800-377-8846 : US 888-276-7715 : Canada 302-709-8424 : International (not a free call!)
2.) enter participant code: 39527048# (remember the "#")
Video Conferencing
The room at JLab does not have video conferencing equipment installed.
Minutes
Attendees: TBD