Difference between revisions of "2015-05-27"
From GlueXWiki
(→Detector Updates) |
(→Detector Updates) |
||
Line 57: | Line 57: | ||
** Calibration [[May 20, 2015 Calibration| May 20, 2015]] - [[Calibration Dashboard]] | ** Calibration [[May 20, 2015 Calibration| May 20, 2015]] - [[Calibration Dashboard]] | ||
* Physics Analysis [[April 6, 2015, Physics Working Group|April 6, 2015]] | * Physics Analysis [[April 6, 2015, Physics Working Group|April 6, 2015]] | ||
− | |||
=== Other Activities === | === Other Activities === |
Revision as of 11:34, 27 May 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday May 27, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Solenoid Update
- Accelerator Schedule Update
Run Planning for Fall 2015
Detector Updates
- Engineering Activities
- Target
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status May 26, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter
- Tracking
- CDC
- FDC
- FADC FPGA
- Calorimeters: May 21, 2015
- BCAL Reconstruction
- TOF May 19, 2015
- Online Systems May 20, 2015
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Activities April 15, 2015
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration May 20, 2015 - Calibration Dashboard
- Physics Analysis April 6, 2015
Other Activities
- PID Upgrades April 2, 2015 PID Upgrade
- Software (Level-3) September 2, 2014
- AOT