Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
(→Tagger Hall) |
(→Collimator Cave) |
||
Line 17: | Line 17: | ||
==Collimator Cave== | ==Collimator Cave== | ||
+ | * Conceptual design of shielding plan from Connecticut ''(5/2006)'' | ||
+ | * Civil design produced by engineering firm for JLab ''(10/2007)'' |
Revision as of 07:49, 18 January 2008
Contents
Tagging Spectrometer
- Conceptual drawings produced by the Glasgow group (ca. 2006)
- 35% drawings produced by the IHEP group (5/2007)
- Interface drawings produced at JLab (1/2008)
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
- 35% drawings produced by Univ. Connecticut (5/2007)
Active Collimator
- 100% drawings produced by Univ. Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)