Difference between revisions of "Photon Beam Commissioning Discussion Sept 17, 2014"
From GlueXWiki
(→Action Items) |
(→Organization) |
||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== Organization == | == Organization == | ||
− | * Time: 4 pm EST | + | * Time: 4:15 pm EST |
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
** H.323 ip address: 199.48.152.152 | ** H.323 ip address: 199.48.152.152 |
Revision as of 10:41, 17 September 2014
Organization
- Time: 4:15 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
Agenda
- Announcements
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending: