Difference between revisions of "Controls Meeting 4-Sep-2014"
From GlueXWiki
(Created page with "* Announcements * FDC chiller interlock (Hovanes) * TAC and collimator motor (Hovanes) * Remote reset of CAEN HVs (Werth) * Status of voltage controls (Nerses) * Any other busine...") |
|||
Line 1: | Line 1: | ||
* Announcements | * Announcements | ||
* FDC chiller interlock (Hovanes) | * FDC chiller interlock (Hovanes) | ||
− | + | * Remote reset of CAEN HV crates (Werth) | |
− | * Remote reset of CAEN | + | * Pair Spectrometer magnet power supply (Hovanes, Mark S.) |
* Status of voltage controls (Nerses) | * Status of voltage controls (Nerses) | ||
* Any other business | * Any other business | ||
− | ** Solenoid | + | ** Solenoid GUIs |
− | ** | + | ** Beamline motors |
+ | |||
==Time/Location== | ==Time/Location== | ||
− | 9:30AM Thurs | + | 9:30AM Thurs 4-Septembert-2014 CC A110 |
Revision as of 09:59, 3 September 2014
- Announcements
- FDC chiller interlock (Hovanes)
- Remote reset of CAEN HV crates (Werth)
- Pair Spectrometer magnet power supply (Hovanes, Mark S.)
- Status of voltage controls (Nerses)
- Any other business
- Solenoid GUIs
- Beamline motors
Time/Location
9:30AM Thurs 4-Septembert-2014 CC A110