Difference between revisions of "Jul 23, 2014 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 30: | Line 30: | ||
= Minutes = | = Minutes = | ||
− | ''Attendees: | + | ''Attendees: Manuel, Elton, Mark, Will, Laura, Shayne (JLab); Andrei (UofR); Sean (NW); Matt (IU) |
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
# FCAL [https://logbooks.jlab.org/book/hdfcal HDFCAL log book] | # FCAL [https://logbooks.jlab.org/book/hdfcal HDFCAL log book] | ||
+ | ## Problem with corrupted base information | ||
+ | ##* Problem has been fixed, due to overwriting memory in software | ||
+ | ##* Previous monitoring output is suspect and issues re-evaluated with corrected software | ||
+ | ##* Test stand is setup, which can be used to extend software development | ||
+ | ## EPICs migration | ||
+ | ##* Hovanes is working on the voltage readout with EPICs. He how has all the necessary equipment. Manuel will work on the GUIs | ||
+ | ##* Need this work completed before the fall run | ||
+ | ## Priorities | ||
+ | ##* Check discrete changes in pulse height in a dozen channels. Evaluate if it is due to hardware failures. | ||
+ | ##* Set pmt gains assuming the LED light output varies smoothly across the detector. | ||
+ | ## FCAL Commissioning | ||
+ | ##* [https://hdops.jlab.org/wiki/index.php/Forward_Calorimeter_Commissioning Draft List for Commissioning] | ||
# BCAL [https://logbooks.jlab.org/book/hdbcal HDBCAL log book] | # BCAL [https://logbooks.jlab.org/book/hdbcal HDBCAL log book] | ||
# Reconstruction and Simulation | # Reconstruction and Simulation | ||
# Calibration | # Calibration | ||
# Any other business | # Any other business |
Revision as of 13:50, 24 July 2014
Video Conferencing Information
Meeting Time: 11:00 a.m. Eastern
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Tentative Agenda
- Announcements
- Action Items
- FCAL HDFCAL log book
- BCAL HDBCAL log book
- Reconstruction and Simulation
- Calibration
- Any other business
Minutes
Attendees: Manuel, Elton, Mark, Will, Laura, Shayne (JLab); Andrei (UofR); Sean (NW); Matt (IU)
- Announcements
- Action Items
- FCAL HDFCAL log book
- Problem with corrupted base information
- Problem has been fixed, due to overwriting memory in software
- Previous monitoring output is suspect and issues re-evaluated with corrected software
- Test stand is setup, which can be used to extend software development
- EPICs migration
- Hovanes is working on the voltage readout with EPICs. He how has all the necessary equipment. Manuel will work on the GUIs
- Need this work completed before the fall run
- Priorities
- Check discrete changes in pulse height in a dozen channels. Evaluate if it is due to hardware failures.
- Set pmt gains assuming the LED light output varies smoothly across the detector.
- FCAL Commissioning
- Problem with corrupted base information
- BCAL HDBCAL log book
- Reconstruction and Simulation
- Calibration
- Any other business