Difference between revisions of "Photon Beam Commissioning Discussion July 29, 2014"
From GlueXWiki
(→Action Items) |
(→Action Items) |
||
Line 15: | Line 15: | ||
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | * Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | ||
* Prepare plan for placing the profiler monitor at collimator, target and beam dump (Hovanes) | * Prepare plan for placing the profiler monitor at collimator, target and beam dump (Hovanes) | ||
+ | * Material for review due July 29: draft of presentations and all pre-brief material | ||
== Agenda == | == Agenda == |
Revision as of 18:00, 23 July 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
- Prepare plan for placing the profiler monitor at collimator, target and beam dump (Hovanes)
- Material for review due July 29: draft of presentations and all pre-brief material
Agenda
- Announcements
- Electron Commissioning (Todd/Mike)
- Photon Commissioning Draft (Alexandre)
- Radiation monitors
- Aug 8 Review:
- Other business
Minutes
Attending: