== Electronics == | == Electronics == | ||
− | - Nick: three CDC HV modules replaced with the ones recently repaired and they are working fine. In the moment we have 2 spare 1550P modules and another 2 are being repaired in Italy | + | - Nick: three CDC HV modules replaced with the ones recently repaired and they are working fine. In the moment we have 2 spare 1550P modules and another 2 are being repaired in Italy. In addition, Fernando ordered two extra 1550Ps that will be delivered by September. |
− | + | - Two thermocouples have been installed on the CDC: one on the cooling duct and the other on the detector. Thus, one can check if the cooling is working. After some measurements it will be possible to interlock the CDC LV supply in case the cooling fails. | |
− | + | == Gas system == | |
− | - | + | - Leak test of the gas system has been performed by closing the mass flow controllers to the detectors first, then closing all the inputs and outputs of the two mixing tanks (pressure graph linked above). It showed a drop of ~1psi in four hours for the CDC tank and much less for the FDC tank. The sniffer showed a leakage on the CDC relief valve of ~10^-3 (from 10^-5 in air) and ~10^-4 on the FDC relief valve. Scott ordered relief valves with better quality from Circle Valve Technology Inc. |
− | - | + | - We used this test to check the leaks in the FDC. The pressures in each cell of the four packages are linked above. The first two cells showed no measurable leak in 6 hours |
== DAQ == | == DAQ == |
Revision as of 17:18, 19 June 2014
June 19, 2014 FDC+CDC meeting
Agenda
- Gas system leakage test, [1], [2], [3], [4]
- DAQ (Beni)
- CDC status (Mike)
- Electronics (Chris, Nick)
- Readiness review (Beni, Lubomir)
- Engineering (Bill)
- cathode measurements
- Other
Instructions for Bluejeans meeting connection
FDC meeting ID: 290664653