Difference between revisions of "2014-06-11"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 33: | Line 33: | ||
* Calorimeters: [[Jun 5, 2014 Calorimetry | June 5, 2014]] | * Calorimeters: [[Jun 5, 2014 Calorimetry | June 5, 2014]] | ||
** FCAL | ** FCAL | ||
− | ** BCAL | + | ** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook] |
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-05-29 | May 29, 2014]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-05-29 | May 29, 2014]] | ||
* Tracking [[Minutes-6-5-2014|Joint FDC/CDC Meeting June 5, 2014]] | * Tracking [[Minutes-6-5-2014|Joint FDC/CDC Meeting June 5, 2014]] |
Revision as of 11:14, 11 June 2014
Contents
Meeting Time and Place
The meeting will be on Wednesday June 11, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
Ongoing Activities
- Technical Construction Report
- Solenoid Current Studies
- Hall D Readiness Review.
- PAC Proposals
- Submitted
- Presentations at PAC Meeting
Reports from Technical Groups
- Calorimeters: June 5, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction May 29, 2014
- Tracking Joint FDC/CDC Meeting June 5, 2014
- CDC
- FDC
- FADC FPGA June 10, 2014
- PID
- TOF June 5, 2014
- Start Counter May 29, 2014
- PID Upgrades May 9, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) May 21, 2014
- Software (Level-3) June 10, 2014
- DAQ/Monitoring/Controls May 21, 2014
- Offline Software
- Offline May 28, 2014
- Calibration June 4, 2014
- Photon Beam and Tagger June 9, 2014
- Physics May 19, 2014