Difference between revisions of "Controls Meeting 6-Feb-2014"
From GlueXWiki
(→Minutes) |
|||
Line 20: | Line 20: | ||
* Dave is pretty close to defining the UPS requirements for the PLC in Hall D. | * Dave is pretty close to defining the UPS requirements for the PLC in Hall D. | ||
* Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements. | * Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements. | ||
+ | |||
+ | === Scope of the meetings === | ||
+ | * Hovanes announced that the purpose of the slow control meetings is to coordinate the activities related to controls performed by people from multiple Hall D groups. | ||
+ | * Before working on an assignment from the meeting everyone needs to check with his/her supervisor before starting to work on those tasks. | ||
+ | |||
+ | === UPS requirements for Motor and Network switches in Hall D === | ||
+ | * According to Hovanes, the only motorized application in Hall D requiring functionality during power loss is the total absorption counter. | ||
+ | * Based on the information from Dave Butler on the location of the PLC hardware, Hovanes defined which network switches will need to be on UPS. | ||
+ | |||
+ | === interlocks for BCAL and FDC === | ||
+ | * Dave presented his plans for the BCAL and FDC interlocks and showed the status of the work. |
Revision as of 10:52, 10 February 2014
Contents
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 23-Jan-2014
- Scope of these meetings (All)
- UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
- Status of interlocks for BCAL and FDC power supplies (Dave)
- GlueX collaboration meeting (Hovanes)
Time/Location
9:30AM Thurs 6-Feb-2014 CC A110
Minutes
Items from previous meetings
- Dave is pretty close to defining the UPS requirements for the PLC in Hall D.
- Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements.
Scope of the meetings
- Hovanes announced that the purpose of the slow control meetings is to coordinate the activities related to controls performed by people from multiple Hall D groups.
- Before working on an assignment from the meeting everyone needs to check with his/her supervisor before starting to work on those tasks.
UPS requirements for Motor and Network switches in Hall D
- According to Hovanes, the only motorized application in Hall D requiring functionality during power loss is the total absorption counter.
- Based on the information from Dave Butler on the location of the PLC hardware, Hovanes defined which network switches will need to be on UPS.
interlocks for BCAL and FDC
- Dave presented his plans for the BCAL and FDC interlocks and showed the status of the work.