Difference between revisions of "GlueX Data Challenge Meeting, January 31, 2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 13: | Line 13: | ||
## Test jobs with EM background to make sure that data size is reasonable and we are not introducing crashes. | ## Test jobs with EM background to make sure that data size is reasonable and we are not introducing crashes. | ||
## Target Distribution (where?). | ## Target Distribution (where?). | ||
+ | ## Are we able to reconstruct event genealogy? | ||
## Test jobs in general with the updated REST format to check new data footprint. | ## Test jobs in general with the updated REST format to check new data footprint. | ||
## Pre-load sets of jobs with ~100 runs on the clusters participating in the data challenge to make sure that things run. | ## Pre-load sets of jobs with ~100 runs on the clusters participating in the data challenge to make sure that things run. |
Revision as of 17:12, 30 January 2014
GlueX Data Challenge Meeting
Monday, January 31, 2014
11:30 pm, EDT
JLab: CEBAF Center, F326/327
Agenda
- Announcements
- Status of Preparations
- Finish reversed magnetic field fixes.
- Do we have standard build/submission stuff to run the challenge?
- Are we ready to produce the event sample?
- Test jobs with EM background to make sure that data size is reasonable and we are not introducing crashes.
- Target Distribution (where?).
- Are we able to reconstruct event genealogy?
- Test jobs in general with the updated REST format to check new data footprint.
- Pre-load sets of jobs with ~100 runs on the clusters participating in the data challenge to make sure that things run.
- Is the JLab CC ready for us?
- What ability will we have for SRM at Jefferson Lab?
- Proposed Schedule
- AOT