Difference between revisions of "Nov 19, 2013 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 29: | Line 29: | ||
# FCAL | # FCAL | ||
# BCAL | # BCAL | ||
− | #* For locating external scintillators, see [http://gluex.phys.uregina.ca/photos photos] | + | #* For locating external scintillators, see [http://gluex.phys.uregina.ca/photos photos]. |
#* Cosmics: TDC time walk correction [[Media:TDCtimewalk.pdf]] | #* Cosmics: TDC time walk correction [[Media:TDCtimewalk.pdf]] | ||
# Reconstruction and Simulation | # Reconstruction and Simulation | ||
− | |||
# TDR update | # TDR update | ||
− | # Calibration of Calorimeters# Any other business | + | # Calibration of Calorimeters |
+ | # Any other business | ||
=Minutes= | =Minutes= | ||
''Attendees: | ''Attendees: | ||
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Monitoring | ||
+ | # FCAL | ||
+ | # BCAL | ||
+ | #* For locating external scintillators, see [http://gluex.phys.uregina.ca/photos photos]. | ||
+ | #* Cosmics: TDC time walk correction [[Media:TDCtimewalk.pdf]] | ||
+ | # Reconstruction and Simulation | ||
+ | #* Will had retrieved the cluster energy equation and is working on locating in the code the constants involved in the reconstruction. | ||
+ | #* Plans are underway to have Giovanni go to CMU and work with Will on reconstruction and BDT. | ||
+ | # TDR update | ||
+ | #* We are working towards a Feb deadline (next Collab meeting). BCAL and FCAL are in reasonable shape with some updates needed on the BCAL side. | ||
+ | # Calibration of Calorimeters | ||
+ | #* Next calibration meeting is tomorrow. Andrei and Zisis will provide starting points for the calibration parameter list. | ||
+ | # Any other business | ||
+ | #* Yi reported on the work related to the online db. Specifically, the intrinsic temperature compensation for the SiPMs also has a secondary non-linear term towards stable operation, and discussion is ongoing how to have these in the db. The idea is to have a unified db system to handle both online and inventory. Zisis mentioned that the BCAL fiber QA and measurements will continue to be managed at Regina, following a common decision with Elliott to not try include them in JInventory. |
Revision as of 13:10, 19 November 2013
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (all)
- Investigate room for mounting an external counter above the solenoid (Elton).
- Send reconstruction equations and what constants are used in the current code (Will).
- Provide short summary of constants and their use in determination of the sampling fraction (David)
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- FCAL
- BCAL
- For locating external scintillators, see photos.
- Cosmics: TDC time walk correction Media:TDCtimewalk.pdf
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees:
- Announcements
- Action Items
- Monitoring
- FCAL
- BCAL
- For locating external scintillators, see photos.
- Cosmics: TDC time walk correction Media:TDCtimewalk.pdf
- Reconstruction and Simulation
- Will had retrieved the cluster energy equation and is working on locating in the code the constants involved in the reconstruction.
- Plans are underway to have Giovanni go to CMU and work with Will on reconstruction and BDT.
- TDR update
- We are working towards a Feb deadline (next Collab meeting). BCAL and FCAL are in reasonable shape with some updates needed on the BCAL side.
- Calibration of Calorimeters
- Next calibration meeting is tomorrow. Andrei and Zisis will provide starting points for the calibration parameter list.
- Any other business
- Yi reported on the work related to the online db. Specifically, the intrinsic temperature compensation for the SiPMs also has a secondary non-linear term towards stable operation, and discussion is ongoing how to have these in the db. The idea is to have a unified db system to handle both online and inventory. Zisis mentioned that the BCAL fiber QA and measurements will continue to be managed at Regina, following a common decision with Elliott to not try include them in JInventory.