Difference between revisions of "Minutes-10-31-2013"
From GlueXWiki
Line 6: | Line 6: | ||
#* FDC installation on platform: [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_1.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_2.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_3.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_4.JPG] | #* FDC installation on platform: [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_1.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_2.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_3.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_4.JPG] | ||
# Engineering (Bill) | # Engineering (Bill) | ||
− | # Electronics (Chris, Nick) [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC-CABLE_LOCATIONS.xlsx] | + | # Electronics (Chris, Nick) [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC-CABLE_LOCATIONS.xlsx Nick's presentation about cable locations/box labeling on platform] |
# Tests in EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | # Tests in EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | ||
#* New F1TDC | #* New F1TDC |
Revision as of 17:28, 31 October 2013
October 31, 2013 FDC meeting
Agenda
- Installation [1]
- FDC survey and rail alignment (Tim, Bill)Survey results_1, Survey results_2
- FDC installation on platform: [2], [3], [4], [5]
- Engineering (Bill)
- Electronics (Chris, Nick) Nick's presentation about cable locations/box labeling on platform
- Tests in EEL126 FDC E-log (Beni)
- New F1TDC
- Other