Difference between revisions of "Minutes-10-31-2013"
From GlueXWiki
Line 4: | Line 4: | ||
# Installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] | # Installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] | ||
#* FDC survey and rail alignment (Tim, Bill)[http://www.jlab.org/Hall-D/detector/fdc/installation/FDCinHall.csv Survey results_1], [http://www.jlab.org/Hall-D/detector/fdc/installation/Prelim_Report_FDC_Inspection_131031.xlsx Survey results_2] | #* FDC survey and rail alignment (Tim, Bill)[http://www.jlab.org/Hall-D/detector/fdc/installation/FDCinHall.csv Survey results_1], [http://www.jlab.org/Hall-D/detector/fdc/installation/Prelim_Report_FDC_Inspection_131031.xlsx Survey results_2] | ||
+ | #* FDC installation on platform: [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_1.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_2.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_3.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/inst_Oct24_28_2013_4.JPG] | ||
# Engineering (Bill) | # Engineering (Bill) | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) |
Revision as of 17:25, 31 October 2013
October 31, 2013 FDC meeting
Agenda
- Installation [1]
- FDC survey and rail alignment (Tim, Bill)Survey results_1, Survey results_2
- FDC installation on platform: [2], [3], [4], [5]
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests in EEL126 FDC E-log (Beni)
- New F1TDC
- Other