Difference between revisions of "Minutes-4-25-2013"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
#* Third package status
 
#* Third package status
 
#* Spare package
 
#* Spare package
# Corrosion tests at MePhi: [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/mephi_results2.xlsx results], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic1.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic2.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic4.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic5.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic6.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic7.jpg]
+
# Corrosion tests at MePhi: [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/mephi_results2.xlsx results], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic1.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic2.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic3.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic4.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic5.jpg], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic6.jpg], [http://http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi/2013-04-18_100c_pic7.jpg]
 +
#* Bottom cathode from package #3 [http://http://www.jlab.org/Hall-D/detector/fdc/corrosion/IMG_0116.jpg discoloration]  
 
# Installation (Lubomir, Bill)
 
# Installation (Lubomir, Bill)
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]
Line 19: Line 20:
 
= Minutes =
 
= Minutes =
  
Participants: Eugene, Fernando, Bill, Dave, Chris, Nick, Simon, and Lubomir.
+
Participants: Casey, Bill, Chris, Nick, Simon, Beni, Fernando, and Lubomir.
  
 
== Production ==
 
== Production ==

Revision as of 15:28, 25 April 2013

April 25, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Third package status
    • Spare package
  2. Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
  3. Installation (Lubomir, Bill)
    • FDC installation document
    • Practicing at Blue Crab
  4. Engineering (Bill)
    • Cooling system tests
  5. Electronics (Chris, Nick)
  6. Full electronics tests FDC E-log (Beni)
  7. Other