Difference between revisions of "Minutes-4-11-2013"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Installation (Lubomir, Bill)
 
# Installation (Lubomir, Bill)
 
#* Channel assignment: [http://www.jlab.org/Hall-D/detector/fdc/documents/Channel_Assignments_FDC.xlsx rack's side (Fernando)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_cabel_assignment.xls signal cables detector side  (Vlad's scheme)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_LV_cable_assignment.xls LV cables detector side  (Vlad's scheme)]
 
#* Channel assignment: [http://www.jlab.org/Hall-D/detector/fdc/documents/Channel_Assignments_FDC.xlsx rack's side (Fernando)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_cabel_assignment.xls signal cables detector side  (Vlad's scheme)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_LV_cable_assignment.xls LV cables detector side  (Vlad's scheme)]
 +
#* Schedule [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_install5.jpg latest version]
 
#* Plans for practicing at Blue Crab  
 
#* Plans for practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)

Revision as of 18:14, 10 April 2013

April 4, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation (Lubomir, Bill)
  3. Engineering (Bill)
    • Cooling system tests
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other