= Minutes =
 
= Minutes =
  
Participants: Eugene, Bill, Dave, Chris, Nick, Simon, Beni, and Lubomir.
+
Participants: Eugene, Dave, Chris, Nick, Beni, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- Dave for the spare parts: wire frame #3 (old) was tested without HV caps (580/-50nA at 2100/-500V) and now Anatoly is soldering them. Last wire frame (#32) was strung by Casey and Dave, Casey is gluing the wires now, tomorrow will come soldering and tension measurements. Don't need to convert type-2 to type-1 cathode frame (mill the O-ring groove) we have enough; the one that was deformed was used and looks OK. No need for extra spacer rings, the ones on the full-scale prototype can be used (Bill). Tina will come over the weekend to work on the last cathodes. Expect to finish with the spare part production in March.
+
- Dave for the spare parts:  
  
 
- Lubomir for package #2: completely tested, oxygen went down to 170ppm. Started installing the grounding, 75% done. It is now on the mounting table
 
- Lubomir for package #2: completely tested, oxygen went down to 170ppm. Started installing the grounding, 75% done. It is now on the mounting table

Revision as of 16:48, 28 February 2013

February 28, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare parts
    • Spare wire plane testing
    • Package #2 status
  2. Rebaselining update [1](Lubomir)
  3. Engineering (Bill)
    • Cooling system test
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other