Difference between revisions of "Jan 22,2013 Readout"
From GlueXWiki
(→Items for followup from previous meeting) |
(→Minutes) |
||
Line 48: | Line 48: | ||
= Minutes = | = Minutes = | ||
− | ''Attending: | + | ''Attending: Elton, Beni, Yi, Fernando, David (JLab); Zisis, Andrei (UofR); Christina, George (Athens); Hayk, Orlando (USM). |
# Announcements | # Announcements | ||
Line 54: | Line 54: | ||
## Thursday February 21, 2013 | ## Thursday February 21, 2013 | ||
## 10:55 Session Ic (100) --- Calorimetry - (Organizer: Matt Shepherd) - Chair: | ## 10:55 Session Ic (100) --- Calorimetry - (Organizer: Matt Shepherd) - Chair: | ||
+ | ## Zisis: suggestion to start the session earlier in the day to allow Athens to participate. (Could interchange session with mechanical or move to the next day) | ||
+ | ## Suggested topics are | ||
+ | ##* Bcal production including testing | ||
+ | ##* Fcal Update including lead glass stacking | ||
+ | ##* Summary of SiPM testing (USM) | ||
+ | ##* Monitoring (Bcal production and Fcal status) | ||
# Review of Action Items | # Review of Action Items | ||
# Monitoring | # Monitoring |
Revision as of 18:36, 22 January 2013
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
- Monitoring
-
Work out shipping details (Elton and Christina)Two packages shipped, should arrive today.
-
- Light guides
-
Review shipping procedures (Will)E-mail from Iñaki describes a new improved packing scheme.
-
- SiPMs
- Recent photos of 17 scratched SiPMs will be uploaded to the data base.
-
Provide a histogram of capacitances of all MPPCs (Orlando)See Capacitance temperature
Presentations from recent meetings
Tentative Agenda
- Announcements
- Collaboration Meeting
- Thursday February 21, 2013
- 10:55 Session Ic (100) --- Calorimetry - (Organizer: Matt Shepherd) - Chair:
- Review of Action Items
- Monitoring
- Update from USM
- Status of gluing light guides at JLab
- Media:Gluing1.JPG Upstream end of module 45 before gluing.
- Media:Gluing2.JPG Upstream end of module 45 without flash.
- Media:P1010007.JPG LED boards mounted onto first column (upstream) module 45
- Media:Gluing4.JPG All columns glued on to upstream of module 45.
- Media:Gluing5.JPG Downstream end of module 45 with 2 columns glued. Shown is the monitoring string secured with Kapton tape
- Status of testing at Regina
- Simulations
- Status of Sampling Fraction Study (Andrei)
- Beam Tests, Cosmics
- Other
Minutes
Attending: Elton, Beni, Yi, Fernando, David (JLab); Zisis, Andrei (UofR); Christina, George (Athens); Hayk, Orlando (USM).
- Announcements
- Collaboration Meeting
- Thursday February 21, 2013
- 10:55 Session Ic (100) --- Calorimetry - (Organizer: Matt Shepherd) - Chair:
- Zisis: suggestion to start the session earlier in the day to allow Athens to participate. (Could interchange session with mechanical or move to the next day)
- Suggested topics are
- Bcal production including testing
- Fcal Update including lead glass stacking
- Summary of SiPM testing (USM)
- Monitoring (Bcal production and Fcal status)
- Review of Action Items
- Monitoring
- Update from USM
- Status of gluing light guides at JLab
- Media:Gluing1.JPG Upstream end of module 45 before gluing.
- Media:Gluing2.JPG Upstream end of module 45 without flash.
- Media:P1010007.JPG LED boards mounted onto first column (upstream) module 45
- Media:Gluing4.JPG All columns glued on to upstream of module 45.
- Media:Gluing5.JPG Downstream end of module 45 with 2 columns glued. Shown is the monitoring string secured with Kapton tape
- Status of testing at Regina
- Simulations
- Status of Sampling Fraction Study (Andrei)
- Beam Tests, Cosmics
- Other