Difference between revisions of "Minutes-1-17-2013"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 9: | Line 9: | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | # Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | ||
− | #* Fourth package tests | + | #* Fourth package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log Entry 101] |
# Other | # Other | ||
Revision as of 18:40, 16 January 2013
January 17, 2013 FDC meeting
Agenda
- Production Construction Tracking
- Production status (Dave)
- Second package tests (Lubomir)
- Basis of Estimate for the FDC activities ,guideline (Lubomir, Bill, Dave)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Fourth package tests FDC E-log Entry 101
- Other