Line 2: | Line 2: | ||
# Check that we have all RTDs already, otherwise order (Chris) | # Check that we have all RTDs already, otherwise order (Chris) | ||
− | # Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. | + | # <strike> Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. </strike> |
− | # Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) | + | # <strike> Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) </strike> |
− | # Make decisions on how to treat sensors with high dark rate (Elton) | + | # <strike> Make decisions on how to treat sensors with high dark rate (Elton) </strike> They satisfy our specifications. Use along with others. |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:00, 10 January 2013
Action Items from previous meetings
- Check that we have all RTDs already, otherwise order (Chris)
-
Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. -
Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) -
Make decisions on how to treat sensors with high dark rate (Elton)They satisfy our specifications. Use along with others.
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: