Difference between revisions of "Jan 10, 2013 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 2: | Line 2: | ||
# Check that we have all RTDs already, otherwise order (Chris) | # Check that we have all RTDs already, otherwise order (Chris) | ||
+ | # Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:24, 6 December 2012
Action Items from previous meetings
- Check that we have all RTDs already, otherwise order (Chris)
- Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: