Difference between revisions of "Minutes-11-8-2012"
From GlueXWiki
Line 4: | Line 4: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave) | ||
#* First package testing (Vlad) | #* First package testing (Vlad) | ||
− | # Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad) | + | # Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/viton_solder.jpg corroded solder on Viton sample] (Vlad) |
# Engineering (Bill) | # Engineering (Bill) | ||
#* Bubbler issue and pressure control [http://www.omnicontrols.com/images/PDF/A3000_cat.pdf] | #* Bubbler issue and pressure control [http://www.omnicontrols.com/images/PDF/A3000_cat.pdf] |
Revision as of 11:52, 8 November 2012
November 8, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- First package testing (Vlad)
- Corrosion tests, corroded solder on Viton sample (Vlad)
- Engineering (Bill)
- Bubbler issue and pressure control [1]
- Electronics (Chris, Nick)
- Third package tests FDC E-log (Beni, Simon)
- Moving to Blue Crab?
- Other